$3,000,000 saving through reduced NPT
Customer Successes
$3,000,000 saving through reduced NPT

Posted on August 21, 2017

Using Rubicon’s proprietary PDC/TCI-based design the client reduced back-reaming time as opposed to a BHA with no back-reaming capability in challenging sand shale with sticking, cutting beds and circulation...

Read more